Luckily, he had two harnesses stored away, one new, one barely used. In December he went through each of them and fixed or inspected every single connection....sigh.
Last week he started taking all the body work off, today he removed the fairing and instruments. By the end of the day, he should have access to the harnesses and be able to remove them.
Here are photos of the bike now, although he is still removing tidbits.
Takes a lot of patience to do a job like that. Good thing the necessary logistics support was already in place!
ReplyDelete