Before Turkey, work continued on the installation of the new front tire, brake rotors and brake calipers.
Friday, November 29, 2019
Wednesday, November 27, 2019
Nov 27, fork oil and some brake work
The tsunami of parts continues. Final brake rotor arrived midday today. Stu cleaned and refilled the forks this morning. Also straightened out some front end alignment issues by lessening fork brace bolts and assorted other pieces, then retightening correctly. Axle now fits smoothly as it slides from one side into the other. Front brake system has been flushed and will be refilled with new brake fluid. All parts look good. Wheel is removed waiting for new tire and brake rotors.
Vacula brake bleeding apparatus:
Vacula brake bleeding apparatus:
Saturday, November 23, 2019
Oil pan, oil filter, oil...oh my
A Saturday to remember, nice weather, clear skies, garage doors wide open and big progress on the bike. The rejuvenation work is going from the back of the bike to the front ;). The rear is done...now comes the middle part. So today the oil drain pan, oil filter and oil were done. Clutch was adjusted. Right side crash bar reattached. Instrument cluster reinstalled. And as usual, I close with a photo of the cutest dog in the world.
Thursday, November 21, 2019
The bath of the oil pan
Every 29 years, whether it needs it or not ;). Actually the pan looked fine with just an accumulation of black silt on the bottom.
Nov 21-rear seals and oil filters
Progress continues...parts are dribbling in. Today was bevel drive seal installation day (rear wheel area) and the start of the removal of oil pan and related oil systems. Lots of excitement removing the oil filter cover...involving heat guns, chemicals, hammers and chisels and brute strength ;).
Subscribe to:
Posts (Atom)